CCalclabhub

One Rep Max Calculator

A one rep max is the heaviest load you can lift once. Testing it directly is risky, so most lifters estimate it from a lighter set — and the whole topic is really about how much you should trust that estimate.

Estimated one rep max (Epley)

116.6667

The same set under the Brzycki formula
112.5
Load for a 90 per cent working set
105
Reps a 75 per cent load typically supports
10

Values update as you type. This calculator covers the single scenario its formula assumes — see Common Mistakes for what it leaves out.

The formula this calculator uses

Epley: 1RM = w x (1 + reps/30) | Brzycki: 1RM = w x 36 / (37 - reps)

w
Weight lifted for the set you completed
reps
Repetitions completed with that weight
1RM
Estimated one rep max, a prediction rather than a measurement
share
Working percentage of the one rep max, such as 0.9 or 0.75

How to check the result by hand

  1. 1

    Complete a set with clean technique

    Choose a weight you can lift for a known number of reps with good form, ideally five or fewer. The whole estimate rests on this set being a genuine effort rather than a comfortable warm-up, so it must be a set you actually finished. If in doubt, use a set on which you could have taken one or two more reps rather than one taken to absolute failure.

  2. 2

    Record the weight and the reps exactly

    For 100 kg for five reps, note both numbers precisely. A rounded weight or an uncertain rep count feeds straight into the estimate, and the formulas will happily produce a confident-looking answer from sloppy inputs.

  3. 3

    Apply the Epley formula for the primary estimate

    100 x (1 + 5/30) = 116.66667. This is the figure most programming tables assume, and it is the one the calculator reports first.

  4. 4

    Apply the Brzycki formula as a cross-check

    100 x 36 / (37 - 5) = 112.5. The two formulas differ by 4.1666667 kg on this set, which tells you the estimate carries a few kilograms of uncertainty and should not be treated as exact.

  5. 5

    Convert the estimate into working loads

    Take 90 per cent for a heavy set: 116.66667 x 0.9 = 105. A 75 per cent load typically supports around ten reps, so the single estimate becomes a set of training numbers rather than one figure. Written down, these figures cover a week of sessions without any further arithmetic.

For worked examples, common mistakes and the limits of this formula, read the full How To Calculate One Rep Max page.